Working History is a single, flat list of every request PawOS has processed — one entry per conversation turn, whether or not it did anything destructive.

Each entry links to that request’s Work Record. Status is derived honestly from what actually happened — Completed, Failed, Blocked, or Stopped — never fabricated as complete for unfinished work.

StatusMeaning
CompletedThe request finished and every action it took succeeded
FailedAn action ran and genuinely failed
BlockedRefused before running — entitlement, usage limit, or a security boundary
StoppedEnded mid-way (interrupted, or a pending confirmation nobody answered)

How it works

What you see

  • Workspaces, tasks, plans, permission questions, Work Records, usage meters and connection status.
  • You use these through normal requests — there is no separate configuration console.

What PawOS does

  • A workspace scopes file and command work; a task groups one request; a plan proposes work; an action performs one concrete step; a Work Record captures what happened.
  • Work Records are built from the real results of each action, not written up afterwards.

Permissions

  • Naming something a workspace, plan or task never skips a permission question.
  • PawOS decides what to do, but every change to your machine goes through a dedicated, checked action.
  • Plan limits and permission questions are separate protections and can both apply.

Records

  • Each claim in a Work Record points to the command, file, check, screenshot or result behind it.
  • A Work Record shows partial success, skipped checks, rejected plans and failures just as clearly as successes.

Good to know

  • Work Records always show the timeline of what ran; many action types add detailed evidence on top.